• +2034623278
  • Unit 19 - Block 17, Third Indus...
  • info@egecegypt.com


El Mahrousa Hotel

  • Manufacturing, Designing and Assembling of all LV Panels “MCC Panels & Distribution Panels”.
  • This Project consists of:

                   1- Three MDB Panels  of 1600A as main incomer with PFC of 200 KVAR consists of 5 steps each is 40 KVAR.

                   2- One 800A Automatic Transfer Switch Panel.

                   3- Seven different Phase sequence correction to insure that the phases are always in the right sequence.

                   4- Twenty three distribution boards for (Kitchens, Floors, HVAC,..Etc).

 

 

 

 

El Mahrousa Hotel