Ultimate Pharma Project

"Full Integrated Electrical Project (EPC)"

- Manufacturing, Design and Assembly of all LV Panels “MCC Panels & Distribution Panels”.

-Bus Bar system Connecting Main Transformer & the main distribution Panel , Also all the Sub main Panels.

-Earthing of ALL Equipment .

-Cabling of ALL Equipment (Control and Power(

-CCTV Systems, Fire protection Systems & Security Systems

- Two Transformers 2 MVA & the ring Main Unit Installation

-Test and Commissioning

- All Lighting Scope internal , External “Solar” & Emergency

- Backup UPS & Generator

 

 

Ultimate Pharma Project